RFP Issued: August 3rd, 2026
Questions Due: September 4th, 2026
Proposals Due: October 9th, 2026
Selection: October 28th, 2026
Primary procurement contact — name, title, email, and phone
Additional decision-makers and their departments
Hilton Head Public Service District
The government authority in Hilton Head Island, South Carolina, is seeking a vendor to replace an existing 10-inch potable water transmission main. The project includes development activities such as reviewing existing conditions, conducting field investigations, and performing utility locating and subsurface utility investigations.
Required engineering services may include civil, utility design, geotechnical, structural, and environmental engineering. The selected contractor will also perform horizontal directional drilling to install a new 10-inch HDPE potable water main, including pipe material and pressure-class selection, entry and exit pits, drilling operations, and pipe installation.
Additional work includes connecting the new main to the existing distribution system, installing isolation valves and air-release or vacuum-relief assemblies as required, and completing pressure, leakage, disinfection, and bacteriological testing. Questions must be submitted by September 4, 2026.