Preliminary Engineering Design Service
Location:
Tacoma, Washington, USA
Posted on:
Jan 1, 2026
Deadline:
Jan 28, 2026
Summary:
Preliminary engineering design services for pedestrian improvements in Tacoma, WA, including sidewalks, curb ramps, and crossing signals.
(1) Vendor needs to provide preliminary engineering design service to the government authority located in Tacoma, WA. – Design pedestrian improvements. The project is funded through State Legislative appropriations and improvements will consist of compliant concrete sidewalks and curb ramps along the south side of 216th Street East and a pedestrian activated crossing signal. • Geotechnical investigation and report • Septic evaluation/design and report • Pavement design and report • Retaining Wall design • Guardrail system design or modifications • Illumination/interconnect design • Pedestrian activated crossing signal design • Stormwater drainage design and report • Channelization/Signage design • Utility coordination • Final Right–of–Way Plans, if necessary (2) All questions must be submitted no later than January 21, 2026.
