Market intelligence for public sector sales teams
RFP Hunter shows what is open. Settle shows what is forming.
Settle pieces together buyer signals, budgets, contract activity, and the sources your team already monitors. See why an opportunity fits and what to do before the RFP posts.
Bids open August 7th, 2026.
Bids close August 28th, 2026.
Work required to be completed on or before June 30th, 2027.
Primary procurement contact — name, title, email, and phone
Additional decision-makers and their departments
Montana Department of Transportation
The vendor will provide services to furnish and install permanent walk-in variable message signs and auxiliary control panels. The work includes fiber optic cable initial ribboning, buffering, fiber stranding, and jacketing.
The scope also includes processing and fabrication of non-ferrous metals, from initial smelting or melting through final shaping, coating, and assembly, as well as the initial combination of plastic, polymer-based, or composite materials through their final form.
The vendor will design sign structures and drilled shaft foundations, then furnish and install the structures at the locations identified in the plans. This includes sign mounting hardware, connections, anchor bolts, fabrication, erection, and all other necessary work required to complete the structures to the engineer's satisfaction.
Analysis generated by Settle AI from the source RFP.
Settle pieces together buyer signals, budgets, contract activity, and the sources your team already monitors. See why an opportunity fits and what to do before the RFP posts.