Engineering Design, Construction Service for Improvements and Alterations
Location:
Allentown, Pennsylvania, United States
Posted on:
Dec 27, 2025
Deadline:
Jan 22, 2026
Summary:
Engineering design and construction services for improvements to a wastewater clarifier in Allentown, PA.
Get full access to this RFP
(1) Vendor needs to provide engineering design, construction service for improvements and alterations to the government authority located in Allentown, PA. – Engineering design and construction improvements and alterations for an existing wastewater circular clarifier drive unit and appurtenances. – Include engineering design, inspection of existing equipment, and installation of the drive unit and appurtenances. – The removal of the existing drive mechanism, installation of new scraper arm blades and replacement of the existing effluent weir. (2) A mandatory pre–bid meeting will be held on January 12, 2026.
