Division 9 Electrical Arc Flash Hazard Analysis and Short Circuit Study Service

Location:

El Monte, California, United States

Posted on:

Deadline:

Summary:

Seeks a provider to conduct an arc flash hazard analysis and short circuit study to improve electrical safety and ensure regulatory compliance for Division 9 in California.

Get full access to this RFP

Download the full RFP document and use Settle's AI to analyze requirements, estimate budget, and draft winning responses in minutes.

A vendor is sought to provide a comprehensive arc flash hazard analysis and short circuit study service for Division 9. The objective is to enhance the organization's electrical safety program, implement additional safety measures for employees, and ensure compliance with relevant regulatory requirements.

The selected firm will assist in the development and implementation of the arc flash assessment, including review and necessary updates to the existing electrical system one-line diagram. The project covers the representation of installed electrical systems for both alternating current (AC) and direct current (DC) at Division 9, reflecting actual field modifications.

Further responsibilities include performing a short circuit and equipment duty study to verify that all equipment is adequately rated for short circuit currents, minimizing hazardous conditions. The vendor will also determine system operating modes and conditions that may impact short circuit currents and arc flash hazard energy levels, and conduct an arc flash hazard analysis to establish appropriate energy levels and necessary Personal Protective Equipment (PPE) specifications.

Best-fit vendors:

• Expertise in arc flash hazard analysis and electrical safety studies

• Prior experience with short circuit and equipment duty studies for industrial or large-scale facilities

• Knowledge of current regulatory mandates and PPE requirements

• Familiarity with updating electrical system diagrams (AC and DC)

• Presence or licensing to operate within California

BG

Submit your next proposal, within 48 hours or less

Stay ahead with the latest advancement in proposal automation.

BG

Submit your next proposal, within 48 hours or less

Stay ahead with the latest advancement in proposal automation.

BG

Submit your next proposal, within 48 hours or less

Stay ahead with the latest advancement in proposal automation.