Airport Maintenance Facility Design-Build Services

Location:

St. Cloud, Minnesota, USA

Posted on:

Dec 5, 2025

Deadline:

Jan 15, 2026

Summary:

Design-build services for a new airport maintenance facility in St. Cloud, MN, including hangar, classroom, offices, and supporting infrastructure.

(1) Vendor needs to provide airport maintenance facility design–build services to the government authority located in St. Cloud, MN. – Provide complete design, engineering, estimating, scheduling, construction management, and energy efficiency services necessary to arrive upon a guaranteed maximum price, including associated deliverables, for incorporation into an amendment covering phases 2 and 3. – The aircraft maintenance hangar will need to support aircraft maintenance, one classroom with 24 students, restroom facilities, faculty offices and storage. – A parking lot shall be provided to support the new facility. – The facility shall be supported by a truss system or similar system of structural support. – Provide code required electrical, HVAC, sprinkler, fire alarm, and similar systems. (2) All the questions must be submitted no later than December 22, 2025. (3) Pre–bid meeting will be held on December 18, 2025.

Get full access to this RFP

Get full access to this RFP

BG

Submit your next proposal, within 48 hours or less

Stay ahead with the latest advancement in proposal automation.

BG

Submit your next proposal, within 48 hours or less

Stay ahead with the latest advancement in proposal automation.

BG

Submit your next proposal, within 48 hours or less

Stay ahead with the latest advancement in proposal automation.

logo

The AI Proposal Manager for winning RFPs.

© 2025 Settle Solutions, Inc. All rights reserved.

Made with ❤️ in SF.

Icon
logo

The AI Proposal Manager for winning RFPs.

© 2025 Settle Solutions, Inc. All rights reserved.

Made with ❤️ in SF.

Icon
logo

The AI Proposal Manager for winning RFPs.

© 2025 Settle Solutions, Inc. All rights reserved.

Made with ❤️ in SF.

Icon