Aerated Static Compost System Design, Permitting and Construction Service
Location:
Mansfield Center, Connecticut, United States
Posted on:
Deadline:
Summary:
RFP for design, permitting, and construction of an aerated static compost system in Mansfield Center, Connecticut, aiming to expand composting capacity and include food scraps from public schools.
Get full access to this RFP
Download the full RFP document and use Settle's AI to analyze requirements, estimate budget, and draft winning responses in minutes.
A government authority in Mansfield Center, Connecticut is seeking a vendor to provide design, permitting, and construction services for an aerated static compost system. The scope includes expanding the existing composting capabilities, specifically to increase the amount of food scraps accepted into the leaf compost pile from collection services.
This project is part of a demonstration authorized in 2020, which enables food scraps from K–12 public schools to be composted on site. The selected firm will be responsible for overseeing the complete process from system design through regulatory permitting and construction. The contract period is anticipated to be for one year.
Interested vendors must submit any questions by April 16, 2026.
Best-fit vendors:
• Experience in compost system design and construction
• Knowledge of permitting for waste management or composting facilities
• Demonstrated ability to manage public sector projects
• Familiarity with school or municipal food waste initiatives
• Presence in Connecticut or surrounding region
