Water Meter Replacement and Advanced Metering Infrastructure System Installation Project
Location:
California, USA
Posted on:
Nov 20, 2025
Deadline:
Jan 14, 2026
Summary:
Project for replacing water meters and installing advanced metering infrastructure for 22,450 units in California.
(1) Vendor needs to provide water meter replacement and advanced metering infrastructure system installation project.– An advanced water meter solution for the City’s approximately 22,450 water meters which includes the supply and installation of non–mechanical water meters and radio transmitters as well as an advanced metering infrastructure software and related training services. (2) A pre–bid meeting will be held on December 3, 2025. (3) All questions must be submitted no later than December 17, 2025.
