For public sector sales teams
The bids are decided before the RFP is written
By the time an RFP like this posts, the winner has usually helped shape it. Settle shows your team the opportunities forming in your market before they become RFPs — so the next one never catches you late.
July 8th, 2026: Plans and specifications available electronically.
July 29th, 2026: Pre-bid meeting at 2:00 p.m.
August 12th, 2026: Bids due by 2:00 p.m.
Primary procurement contact — name, title, email, and phone
Additional decision-makers and their departments
Town Of Cary
A government authority in Carrboro, North Carolina is seeking a contractor to provide UV system improvements services. The project includes demolition and removal of the existing UV structure channel, piping, valving, and miscellaneous related components.
The scope of work includes installation of a new UV structure with clear well, two equal-size channels, and a cascade aerator. Additional work includes installation of ductile iron piping, fittings, valves, UV disinfection modules, and related appurtenances such as weirs and level sensors.
The contractor will also install a new 48-inch ductile iron gravity line connecting the filtration unit to the influent UV structure, as well as two 4-HP reclaim water pumps and associated piping to tie into the existing reclaim water piping system. The contract period is anticipated to be one year.
Analysis generated by Settle AI from the source RFP.
Create a free account and Settle watches your market for you — search the full database, filter by your criteria, and get every new RFP matched to your business as it posts.