Deals like this one start months before the RFP. Settle reads the signals first, so your team is talking to the buyer while competitors are still waiting for the posting.
How an RFP like this forms
Budget approved
Settle flags itBoard minutes and budget documents
Scope and vendors researched
Settle flags itPlanning documents, meeting agendas, contract renewals
RFP posted
You are hereEvery bidder can see it now
A government authority located in Salt Lake, Utah, is seeking a vendor to provide reset center construction services. Required work includes the installation and provision of a range of valve types, such as ball valves (MSS SP–110, 2-piece copper–alloy body, chrome–plated brass ball), check valves (MSS SP–80, swing type with bronze body), gate valves (MSS SP–80, bronze body, solid wedge), and globe valves (MSS SP–80, bronze body, nonmetallic disc). All valves specified are NPS 2 and smaller with minimum class and pressure requirements.
The project scope also includes the supply and installation of dry–pipe valves meeting UL certification standards (UL 260, UL 1486), incorporating necessary components such as quick-opening devices, trim sets, and connections for air supply, drainage, priming levels, alarms, pressure gauges, and related attachments. The initial contract period is one year. A pre-bid meeting is scheduled for June 16, 2026, and all questions must be submitted by June 30, 2026.
Analysis generated by Settle AI from the source RFP.
Settle pieces together buyer signals, budgets, contract activity, and the sources your team already monitors. See why an opportunity fits and what to do before the RFP posts.