Website notice: June 24th, 2026
Specifications available: June 24th, 2026
Mandatory pre-bid conference: July 2nd, 2026
Bid submission deadline: July 21st, 2026
Bid opening: July 21st, 2026
Anticipated award date: August 17th, 2026
Installation completion: September 25th, 2026
Winterization completion: October 31st, 2026
Spring start-up completion: May 1st, 2026
Primary procurement contact — name, title, email, and phone
Additional decision-makers and their departments
City Of Warwick
A government authority in Warwick, Rhode Island seeks a vendor to provide irrigation system design-build project services. The selected contractor is responsible for designing a system that includes separate irrigation zones as needed, while taking all necessary precautions to prevent damage to existing site features such as grading, walks, curbs, pavements, utilities, landscaping, tree protection zones, and structures.
The contractor must ensure the protection of all utilities, including electrical, storm sewer, sanitary sewer, and water main lines. Coordination of all work required for connection to the existing water system is necessary, and the contractor is responsible for supplying and installing all fittings, valves, piping, and appurtenances needed for a complete project installation.
A mandatory pre-bid conference is scheduled for July 2, 2026, and all questions must be submitted no later than July 14, 2026.