Market intelligence for public sector sales teams
RFP Hunter shows what is open. Settle shows what is forming.
Settle pieces together buyer signals, budgets, contract activity, and the sources your team already monitors. See why an opportunity fits and what to do before the RFP posts.
A government authority in Lee’s Summit, Missouri is seeking a vendor to provide building demolition services. The scope includes demolition and removal of existing structures, bolted-down equipment, footings, floor slabs, parking lot areas, and metal storage racks located on the warehouse floor.
The work also includes demolition of an indoor freezer, indoor cooler, underground fire suppression system infrastructure, an exterior 86,000-gallon underground steel water tank located on the north side of the warehouse, and the fire pump house on the northwest side of the warehouse. All demolition materials, including building debris, concrete, masonry, asphalt, and parking lot debris, must be hauled off site to a legal landfill or reclaim facility.
Following demolition, all resulting voids caused by the removal of the concrete slab and foundation walls must be filled with suitable soil and properly compacted. A pre-bid meeting is scheduled for August 4, 2026.
Analysis generated by Settle AI from the source RFP.
Settle pieces together buyer signals, budgets, contract activity, and the sources your team already monitors. See why an opportunity fits and what to do before the RFP posts.