See More RFPs

Flood Water Diversion System Rehabilitation Engineering Services

Overview


Architecture, Engineering & Urban Planning
Madison, Connecticut, United StatesPosted: July 1st, 2026Deadline: August 12th, 2026

Settle Signals


Market intelligence for public sector sales teams

RFP Hunter shows what is open. Settle shows what is forming.

Settle pieces together buyer signals, budgets, contract activity, and the sources your team already monitors. See why an opportunity fits and what to do before the RFP posts.

Learn more about Settle

SUMMARY


Engineering services are requested for the rehabilitation of a flood water diversion system in Madison, Connecticut, including site assessment, engineering design, and environmental permitting.

KEY REQUIREMENTS


TIMELINE


Pre-proposal site meeting: July 14th, 2026 at 10:00 AM.

Proposal due date: August 12th, 2026 at 4:00 PM.

CONTACTS


Primary procurement contact — name, title, email, and phone

Additional decision-makers and their departments

Issuing Agency


Town Of Madison

Organization overview and procurement intelligence available on paid plans.
See Issuer Research

DESCRIPTION


The government authority located in Madison, Connecticut is seeking a qualified vendor to provide engineering services for the rehabilitation of a river flood water diversion system. The scope of work includes preparing comprehensive engineering plans and specifications for the rehabilitation, as well as providing engineering oversight during all construction activities associated with the project.

The selected firm will conduct a site assessment, including an evaluation of the dam, diversion channel, and associated structures. Responsibilities also encompass surveying and mapping, specifically measuring trees to be removed within the easement and documenting all trees greater than 4 inches in diameter at breast height (DBH), with their locations to be clearly shown on the project plans. Environmental permitting and preparation of detailed engineering plans addressing all required maintenance work are also required. A pre-bid site meeting is scheduled for July 14, 2026.

Similar RFPs


Frequently asked questions


When is the submission deadline?
Submissions are due August 12, 2026.
Who issued this RFP?
It was issued by Town Of Madison. The work is located in Madison, Connecticut, United States.
Who is a good fit for this opportunity?
  • Civil or environmental engineering firm with proven experience in flood control or water diversion projects
  • Expertise in dam and channel assessments and rehabilitation design
  • Capacity to perform onsite surveying, mapping, and environmental permitting
  • Experience providing engineering oversight during construction
  • Licensed to operate in Connecticut

Analysis generated by Settle AI from the source RFP.

RFP Hunter shows what is open. Settle shows what is forming.

Settle pieces together buyer signals, budgets, contract activity, and the sources your team already monitors. See why an opportunity fits and what to do before the RFP posts.

See how Settle works
    Flood Water Diversion System Rehabilitation Engineering Services (Due August 12, 2026) | Settle RFP Hunter