Market intelligence for public sector sales teams
RFP Hunter shows what is open. Settle shows what is forming.
Settle pieces together buyer signals, budgets, contract activity, and the sources your team already monitors. See why an opportunity fits and what to do before the RFP posts.
RFP Released: June 26th, 2026
Informational Meeting: July 6th, 2026
Vendor Questions Due: July 10th, 2026
Response to Vendor Questions Provided: July 17th, 2026
Vendor RFP Due: July 24th, 2026
Vendor Interviews: Week of July 27th, 2026
Vendor Selection: August 31st, 2026
Work Period Starts: 2027
Primary procurement contact — name, title, email, and phone
Additional decision-makers and their departments
Village Of Hoffman Estates
A government authority in Estates, Illinois is seeking a vendor to provide comprehensive fiber optic infrastructure extension services. The selected vendor will be responsible for outside plant engineering, including both underground and aerial installation, as well as comprehensive testing and end-to-end certification of newly installed fiber optic cabling.
The scope includes all necessary labor, materials, permitting, right-of-way management, trenching or boring, cable placement, splicing, and industry-standard link certification testing. The project involves installation and end-to-end splicing of outside plant (OSP) fiber optic cable, approximately 400 meters, using 6-strand single-mode armored, outdoor-rated fiber. Deployment includes fiber selection, fusion splicing at specified handholes and demarc points, installation of service loops, and permanent, weatherproof labeling in compliance with VOHE IT standards.
Upon completion, the vendor must provide thorough testing and verification, including bi-directional OTDR and Power Meter certification for all fiber strands at 1310nm and 1550nm wavelengths. Comprehensive reports—including pass/fail metrics, trace graphics, and optical attenuation loss budgets for each strand—must be submitted in PDF format. Detailed as-built GIS maps or CAD files mapping the exact path, depth, and locations of all buried conduits and handholes are also required. The contract period is for one year, with pre-bid and question deadlines specified.
Analysis generated by Settle AI from the source RFP.
Settle pieces together buyer signals, budgets, contract activity, and the sources your team already monitors. See why an opportunity fits and what to do before the RFP posts.