Engineering Services

Location:

New Milford, Connecticut, United States

Posted on:

Deadline:

Summary:

Seeking engineering services for design and installation of new fire hydrants and fire protection at an elementary school in New Milford, Connecticut.

Get full access to this RFP

Download the full RFP document and use Settle's AI to analyze requirements, estimate budget, and draft winning responses in minutes.

An opportunity is available for qualified engineering firms to provide professional design and installation services for new fire hydrants and improved fire protection at an elementary school in New Milford, Connecticut. The scope of work includes delivering code-compliant fire hydrant installations that ensure sufficient exterior fire protection coverage across the school grounds.

Vendors will be expected to review existing site plans, utility drawings, and fire protection reports, as well as determine the precise horizontal and vertical locations of the current water main, underground utilities, and site topography. An on-site inspection is required to evaluate the present condition of the fire hydrant coverage and water supply infrastructure. The selected firm will prepare stamped engineering drawings and technical specifications for the fire hydrant installation, including comprehensive civil and plumbing plans.

BG

Submit your next proposal, within 48 hours or less

Stay ahead with the latest advancement in proposal automation.

BG

Submit your next proposal, within 48 hours or less

Stay ahead with the latest advancement in proposal automation.

BG

Submit your next proposal, within 48 hours or less

Stay ahead with the latest advancement in proposal automation.